|
Chassis Plans offer complete
Network Equipment Building Systems (NEBS) Compliance
for custom rackmount enclosures. Chassis Plans can
simulate NEBS requirements to GR-63-CORE for Physical
Protection Standards and GR-1089-CORE for EMC, Surge
Standards & Electrical Safety. These requirements
ensure the reliability, safety and performance of your
custom rackmount enclosures from Chassis Plans.
See our Custom
Examples
All GR-63, GR-487 and ETSI physical
requirements can now be meet and expanded capabilities
can include both the seismic and fire resistance. 
NEBS testing is required for anyone supplying equipment
to the Regional Bell Operating Companies (RBOCs) and
the Competitive Local Exchange Carriers (CLECs). Any
NTS partners are NVLAP approved and FCC listed. We also
have the capability to test equipment to the appropriate
TBR/CTR standards for Europe.
EMC & Electrical
Safety
GR-1089-CORE for EMC, Surge Standards and Electrical
Safety
- Pre-compliance
- ESD Testing
- FCC-Part 15, 18 & 68 Telecom
- EMC Emissions & Immunity
(10kHz to 10 GHz)
- Electrical Safety/Grounding
and Compliance
- Lightning and AC Power Fault
Exposure (2nd Level)
- Consulting for Telecom, EMC
and Product Safety
- CE Mark/FCC
- Bonding and Grounding
- First and Second Level Lightning
Surge Testing
Physical Testing
GR-63-CORE
Physical Protection Standards
- Complete Physical Testing
- Temperature, Humidity and Altitude
- High & Low Temperature Exposure
and Thermal Shock

- Fire Resistance (Spread) and
Heat Dissipation
- Smoke Corrosivity
- Earthquake Vibration/Resistance
- Office Vibration
- Airborne Contaminants
- Transportation Vibration
- Acoustic Noise
- Illumination
- Thermal Operating Conditions
- Handling Drop Tests
Chassis Plans provides unmatched
experience in custom design capability from simple modifications
of existing chassis to completely custom products designed
entirely to customer specification. No other company
can match our costs or depth of design for semi-custom
or totally custom industrial systems. See Custom Examples.
With over 25 years of combined
experience in industrial computer design, manufacturing,
and agency certification, no project will present difficulties
not previously resolved. We are experienced and conversant
in the following subjects:
- SAIC Belcore NEBS compliant
Central Office platforms
- European CE compliance
- Military applications
- Airborne applications
- Highly ruggedized platforms
for oil and gas exploration
- Computer telephony
- Fault tolerant platforms
- Multi-CPU systems
- Medical systems per UL544
- Power supply designs and
issues
- Mil-specs
- Extreme environments for
temperature, shock and vibration
- All aspects of agency
approvals
- Manufacturing systems
- System issues for CPU
and backplane design and selection
- I/O card application and
support
- I/O card design and manufacturing
- See Custom Examples.
|